Factory in a box

Your plant, running in weeks, not years.

Arnnel designs, builds and commissions complete manufacturing lines off-site, then ships them as modular, pre-tested systems that plug into your building and start producing.

Typical lease-to-first-part
16wks
Of commissioning done before it ships
70%
One contract, one schedule, one call
1team
Built forFood & beverageMedical devicesBattery & energyContract electronicsConsumer goodsAdvanced materials

What's in the box

Everything between an empty building and a running line.

01

Layout & digital twin

Your floor, your product and your volumes, simulated before a single anchor bolt goes in.

02

Process equipment on skids

Lines built and run on our floor, then split into modules sized for a truck.

03

Controls, MES & IIoT

PLCs, sensors and the software that reads them, wired and tested as one system.

04

Utilities & power

Air, water, power distribution and exhaust packaged to plug into your building.

05

Quality & traceability

Inspection stations and part history from the first shift, ready for your audits.

06

People & training

Your operators trained on the real line before it ships, and support after.

How it works

Built on our floor. Running on yours.

  1. Wk 1–21

    Spec

    Product, volumes, building. We size the line and price it.

  2. Wk 2–52

    Simulate

    A digital twin of the plant proves throughput and layout.

  3. Wk 4–123

    Build & test

    Assembled and run on our floor with your parts.

  4. Wk 13–144

    Ship & plug in

    Modules land, bolt down and connect to utilities.

  5. Wk 15+5

    Run & improve

    Production starts; Arnnel OS keeps watching the line.

Arnnel OS

Software that ships with the steel.

Every line arrives connected. Output, downtime and quality are live from the first shift, and the same twin that designed your plant keeps tuning it.

  • Live OEE, scrap and throughput by station
  • Digital twin kept in step with the floor
  • Remote support from the team that built it
Line 2 · AssemblyLive
OEE87.4%
Parts today12,480
Scrap0.6%
FeedFormWeldInspectPack

The brand at work

On the crew, the paperwork and every crate that ships.

The guide in an Arnnel cap and long-sleeve shirt
Crew cap and shirtSmall prints on the cap and left chest.

Arnnel Industrial Systems
1200 Foundry Way
Minneapolis, MN 55413

November 3, 2026

Re: Line 2 commissioning schedule

Dear Ms. Alvarez,

Your forming and inspection modules passed their run-off on our floor this week at 104% of target rate. They ship on the 17th and land at your plant ready to bolt down.

Our install crew arrives the same morning. First parts are planned for the following Monday.

Jordan Reyes
Project lead, Arnnel

arnnel.comFactory in a box.
LetterheadUS Letter. Logo top left, signal rule at the foot.

Systems catalog

Factory
in a box.

Vol. 01Lines · Modules · Arnnel OS
Catalog coverThe systems catalog: ink cover, the line on the front.

Jordan Reyes

Project lead

jordan@arnnel.com
612 555 0148

Business cardsLogo on the front, details on the back.

LINE 2 · MODULE 04 / 12

THIS SIDE UP · KEEP DRY · 1,840 KG

Shipping crateStenciled on every module that leaves the floor.

Have a building and a product? We'll handle what goes between.

Concept 1 · Square stop
Arrow keys switch